日本国产欧美,日韩国产三级,国产日产精品久久久久,欧美日韩国产在线一区,国产日产久久欧美清爽,亚洲经典一区二区三区,日韩精品区

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


京山县| 昌宁县| 炎陵县| 天门市| 延吉市| 东港市| 碌曲县| 长岛县| 靖州| 普兰店市| 宜兰市| 平原县| 嫩江县| 台中县| 博湖县| 读书| 依兰县| 德兴市| 政和县| 夹江县| 浦县| 游戏| 北票市| 宜兰市| 磐石市| 闽侯县| 濮阳县| 浮梁县| 特克斯县| 浑源县| 蓬安县| 敦化市| 福清市| 深泽县| 库伦旗| 鸡泽县| 井陉县| 九台市| 长宁区| 若羌县| 高州市|